EPC Upgrade Funding for Landlords
EPC upgrade funding pays for the insulation, heating and glazing work a rental property needs to meet minimum energy efficiency standards. Factored advances UK landlords £1,000 to £75,000 against future rent within 24 hours, so EPC works can start before a compliance deadline rather than after it.
Last updated:
What EPC works typically cost
- Loft and cavity wall insulation: £500 to £3,000.
- Boiler replacement: £2,000 to £4,500.
- Double or triple glazing: £4,000 to £12,000.
- Solid wall insulation: £8,000 to £22,000.
- Full retrofit of a Victorian terrace: frequently £15,000 to £30,000.
Why speed matters for MEES compliance
Under the Minimum Energy Efficiency Standards, a property below the required EPC band cannot be let on a new tenancy, and the government has consulted on raising the threshold to EPC C for the private rented sector. Guidance is published at gov.uk.
Every month a property cannot be let is a month of lost rent, which usually outweighs the cost of funding the work immediately.
How landlords fund EPC work with Factored
Factored purchases a portion of the rent from the current or incoming tenancy and pays the landlord a lump sum, typically the same working day the paperwork is signed. The improved property then commands the rent that settles the advance.
Ways to fund EPC upgrades compared
| Option | Speed | Fees and security |
|---|---|---|
| Factored rent advance | 24 hours | No legal fees, no valuation, no charge |
| Further advance from lender | 4 to 8 weeks | Valuation, affordability check, secured |
| Second charge loan | 3 to 6 weeks | Legal fees, valuation, charge registered |
| Green home improvement loan | 1 to 3 weeks | Unsecured, hard credit search, fixed repayments |
| Savings | Immediate | Depletes reserves for voids and repairs |
When a rent advance may not suit you
- A rent advance is sized on contracted rental income, so it is not the right route for sums far larger than the rent a property produces. Purchases and large developments are usually better served by a mortgage or a bridging facility.
- Because settlement comes out of rent already being collected, landlords who need that full rent for monthly mortgage payments should check the reduced income still covers their outgoings before applying.
- A property with no tenancy in place, or with rent not being paid, will not qualify — the advance is priced against rent that is contracted and flowing.
- Where a landlord wants the cheapest possible cost of capital over several years and can wait weeks for funds, refinancing at a low rate may be less expensive than a short-term advance.
Sources and official guidance
Frequently asked questions
Can I fund EPC upgrades without remortgaging?
Yes. A Factored rent advance of £1,000 to £75,000 funds EPC works from contracted future rent and leaves the existing buy-to-let mortgage in place.
How fast can EPC upgrade funding be arranged?
Factored funds approved landlord applications within 24 hours, so EPC contractors can be booked the same week.
Does the property need to be tenanted?
Factored funds against a signed tenancy agreement, including an incoming tenancy that begins once the EPC works are complete.
What EPC rating do rental properties need?
Minimum Energy Efficiency Standards currently require a valid EPC of band E or above to let most properties in England and Wales, with government proposals to raise this to band C. Check the current rules at gov.uk.
Can I fund several properties at once?
Yes. Portfolio landlords can raise up to £75,000 across multiple tenancies in a single Factored application.